Division 03 · GC

Gravity Chute

Efficient waste management systems designed for hygienic and sustainable building operations, in collaboration with CHAB, gravity chute specialists for 50 years.

Our services

Cleaner buildings, better waste management.

One team for the full life of your chute system.

  1. 01

    Chute installation

    Supply and installation of complete chute systems.

  2. 02

    System modernization

    Upgrading existing chute systems.

  3. 03

    Maintenance contracts

    Planned maintenance to keep every chute performing.

  4. 04

    Technical inspection & support

    Inspection and technical support from specialists.

  • ImprovedHygiene
  • BetterWaste management
  • FewerOperational issues
  • DurablePerformance
Gravity chute system from roof ventilation to the waste bin

Convenient waste disposal

The gravity chute.

Gravity chutes carry waste from upper floors to a central collection point that is easy, safe and hygienic.

3+Gravity chutes are mandatory for all buildings with three (03) storeys and higher.

Types of chute

  • Garbage chute
  • Linen chute
  • Paper chute
  • Podium chute

Know the compatibility

Building typeChute typeDiameterDoor type
Commercial / ResidentialGarbage500 | 600 | 700 mmBottom-hinged
Hotel / Hotel apartmentLinen600 | 700 mmBottom-hinged | Side-hinged
MallGarbage / Podium700 | 800 | 900 mmBottom-hinged
HospitalGarbage / Linen500 – 900 mmBottom-hinged | Side-hinged
VillaGarbage / Linen / Podium500 | 600 mmBottom-hinged | Side-hinged

Engineering

The chute structure.

From top to bottom: ventilation unit, mechanical access unit, typical floor and discharge pipe (elbow).

01 · Standard

Naked steel duct

  • Stainless steel grade 304 | 316
  • 1.5 mm thickness
  • 600 mm diameter

02 · Integrated

Duct + MEP

  • PPR riser (plumbing)
  • Electrical conduits
  • Fire-fighting riser

03 · Complete

Duct + attachments

  • All peripherals & accessories
  • Waste handling equipment at the base

Elite design system

Smarter, cleaner chutes.

Designed and built with a focus on sustainability, managing waste at source and moving it from any floor to the collection room.

  • 01

    Energy efficiency

    Less wiring and lower voltage requirements.

  • 02

    Health & hygiene

    Automatic cleaning with smart controls.

  • 03

    Water efficiency

    Flow meter and fluid sensor regulate water and sanitiser use.

  • 04

    Indoor air quality

    In-chute air quality sensor signals the system to respond.

  • 05

    Local fabrication

    Manufactured locally on modern machines that combine several production stages.

Engineering

Sections & components.

More than a vertical tube: every section, collar and joint is engineered for smooth, snag-free flow.

The pipes

Duct pipes are the backbone of each chute, connecting floor to floor like a clean engineered spine.

  • Intake & extension pipes
  • Telescopic joint & grooved piping
  • All pipes fully welded
Chute pipe support frame with steel ring clamp

The pipe support

The hidden strength that keeps every chute tall, stable and safe.

  • Support frame
  • Steel ring clamps
  • Wall angles
  • Anchor bolts
Painted and insulated chute pipe

Pipe applications

Painted: DEDPAN DC 1050A low-VOC sound damping compound. Eliminates sound and leakage, prevents oxidization, fire-resistant.

Insulated: added thermal insulation for extra acoustic protection, subject to site conditions.

Chute cleaning system in the mechanical access unit

The cleaning system

Housed in the mechanical access unit.

Sanitizing S-Unit: solenoid valve, gate valve and sanitizing tank release pressurized water with disinfectant.

Brush unit: moves up and down, scraping the inner wall of the chute.

Engineering

From roof to collection room.

  1. The chute’s airway

    Ventilation unit

    Exhausts undesirable odours into the atmosphere. Fan housing with ventilation fan, ventilation pipe and reducer, fabricated to extend 1,200 mm (4 ft) above roof level.

  2. Where disposal begins

    Intake hopper door

    2-hour fire-rated, hand or foot-pedal operated, 24 VDC. Red “busy” and green “available” indicators, electric strike lock, gas spring, gasket and sprinkler adaptor.

  3. The final waste passage

    Discharge pipe

    A velocity reducer at the impact zone slows falling refuse for safety and avoids clutter in the collection room. 2.0 mm reinforcement plate; one offset at the base, subject to site conditions.

    Chute discharge pipe with velocity reducer
  4. The command hub

    Control panels

    ODO manages doors, safety and indicators. Brush adds cleaning-cycle control. AWCS links the chute to automated waste collection.

    Chute control panel

Where every disposal ends

Waste handling equipment.

The building’s final waste containment, keeping the collection room clean, organised and ready for recycling or disposal. S.S., G.I. and HDPE bins, plus compactors.

Stainless steel 1.1 cubic metre waste bin
1.1 m³ S.S. binW 1,200 mm · D 800 mm
H 1,180 mm with wheels
Galvanised iron 1.1 cubic metre waste bin
1.1 m³ G.I. binW 1,200 mm · D 900 mm
H 1,390 mm with wheels
Cylindrical 1.1 cubic metre waste bin
1.1 m³ cylindrical binAvailable in G.I. and S.S.
Galvanised iron 2.5 cubic metre waste bin
2.5 m³ G.I. binW 1,655 mm · D 1,370 mm
H 1,550 mm with wheels
HDPE wheeled waste bin
HDPE binsFrom 24 L to 1,100 L
  • 1,100 L · 660 L Industrial big HDPE
  • 360 L · 240 L · 120 L Industrial medium HDPE
  • 80 L to 24 L Household small HDPE (80 · 65 · 60 · 46 · 45 · 40 · 24 L)

Space savers

Bin compactors.

Portable compactors that reduce garbage size to 20–25% of the original volume. Less cumbersome and space-saving, ideal where the collection room is tight.

Standard bin compactor
StandardCompatible bins: 360, 240, 120, 75 L
Weight: 318 kg
Pro bin compactor
ProCompatible bins: 1.1 m³, 1,100 L, 660 L
Weight: 1,045 kg
Max bin compactor
MaxCompatible bins: 2.5 m³
Weight: 1,150 kg

Gravity chutes?

We provide everything, and more.

Expertise in a box: one team for the full life of your chute system.

Your one-stop gravity chute provider

  1. 01Installation
  2. 02Maintenance
  3. 03Annual maintenance contract
  4. 04Supply & installation of parts
  5. 05Retrofitting
  6. 06Consultancy

Let’s discuss your project

Let’s build the future together.

Powering Industries with Smart Engineering Solutions.